SOLUTIONS FOR CONSTRUCTION & MINING
Prime Power for Remote Sites.
Without the Convoy.
Prime Power for Remote Sites.
Without the Convoy.
Hydrogen power infrastructure for construction projects and mining operations
beyond reliable grid reach or where diesel logistics are prohibitively expensive.
Hydrogen power infrastructure for construction projects and mining operations
beyond reliable grid reach or where diesel logistics are prohibitively expensive.
Silent, zero-emission power from 50kW to multi-MW. Eliminates fuel theft, noise complaints, and convoy costs.
Relocatable to your next project when complete.
Silent, zero-emission power from 50kW to multi-MW. Eliminates fuel theft, noise complaints, and convoy costs.
Relocatable to your next project when complete.
Remote Operations Demand Better Than Diesel.
Defense and strategic installations face unique energy challenges where conventional power solutions compromise operational security.


Construction and mining projects face energy challenges that directly impact profitability and project timelines.
Design and specifications subject to change. The final VapourGen units are optimised for real world deployment; actual product appearance may vary slightly based on final engineering certifications and site-specific operational needs.
3 OPERATIONAL CHALLENGES:
LOGISTICS COSTS & FUEL THEFT
LOGISTICS COSTS & FUEL THEFT
Remote sites face continuous fuel challenges:
• Convoy costs to deliver diesel (₹20-40/liter markup at remote sites)
• Fuel theft averaging 20-30% of consumption
• Armed security requirements for fuel storage
• Weather disruptions affecting resupply
• Storage permit compliance for large volumes
Remote towers rely on diesel backup with continuous operational challenges:
• Fuel theft averaging 15-25% of consumption
• Logistics costs for delivery to remote sites
• Noise restrictions in urban and residential areas
• Rising diesel costs (+40% since 2020)
• ESG mandates requiring emission reductions
Remote sites face continuous fuel challenges:
• Convoy costs to deliver diesel (₹20-40/liter markup at remote sites)
• Fuel theft averaging 20-30% of consumption
• Armed security requirements for fuel storage
• Weather disruptions affecting resupply
• Storage permit compliance for large volumes
NOISE & ENVIRONMENTAL RESTRICTIONS
NOISE & ENVIRONMENTAL RESTRICTIONS
Projects increasingly face operational limits:
• Urban construction sites with strict noise limits (55-75 dB(A) daytime)
• Residential area complaints and legal action
• Night work restrictions due to generator noise
• Environmental impact assessments requiring emission reductions
• ESG requirements from project financiers
UNPREDICTABLE COSTS & DOWNTIME
UNPREDICTABLE COSTS & DOWNTIME
Diesel dependency creates financial uncertainty:
• +40% fuel cost increases since 2020
• Price volatility affecting project budgets
• Maintenance downtime during critical phases
• Generator failures delaying construction schedules
• Insurance and compliance costs rising
THE BOTTOM LINE:
THE BOTTOM LINE:
Remote projects need reliable, cost-predictable power.
Diesel delivers neither anymore.
Remote projects need reliable, cost-predictable power.
Diesel delivers neither anymore.
Power Your Project. Eliminate Diesel Complexity.
Power Your Project. Eliminate Diesel Complexity.


VapourGen and VapourGen-E deliver prime or backup power for construction and mining operations from 50kW temporary power to multi-MW permanent installations.
HOW IT WORKS:
For Accessible Sites (VapourGen):
AI-managed canister delivery eliminates convoy planning. Silent operation meets urban noise restrictions. Hot-swap refueling with zero downtime. Relocatable to next project when complete.
For Accessible Sites (VapourGen):
AI-managed canister delivery eliminates convoy planning. Silent operation meets urban noise restrictions. Hot-swap refueling with zero downtime. Relocatable to next project when complete.
For Accessible Sites (VapourGen):
AI-managed canister delivery eliminates convoy planning. Silent operation meets urban noise restrictions. Hot-swap refueling with zero downtime. Relocatable to next project when complete.
For Remote Operations (VapourGen-E):
On-site hydrogen production from solar/wind eliminates external fuel dependency. Perfect for mining operations, remote infrastructure projects, or sites beyond cost-effective diesel delivery.
For Remote Operations (VapourGen-E):
On-site hydrogen production from solar/wind eliminates external fuel dependency. Perfect for mining operations, remote infrastructure projects, or sites beyond cost-effective diesel delivery.
For Remote Operations (VapourGen-E):
On-site hydrogen production from solar/wind eliminates external fuel dependency. Perfect for mining operations, remote infrastructure projects, or sites beyond cost-effective diesel delivery.
WHAT MAKES IT DIFFERENT:
WHAT MAKES IT DIFFERENT:
Silent operation <45 dB(A)
(deploy in noise-restricted zones)
Silent operation <45 dB(A)
(deploy in noise-restricted zones)
Zero emissions
(meet environmental permit requirements)
Zero emissions
(meet environmental permit requirements)
Predictable costs
(protection from diesel volatility)
Predictable costs
(protection from diesel volatility)
Managed fuel logistics
(eliminate theft and convoy overhead)
Relocatable
(move to next project, no stranded assets)
Managed fuel logistics
(eliminate theft and convoy overhead)
Relocatable
(move to next project, no stranded assets)
Stop Managing Fuel. Start Delivering.
Stop Managing Fuel. Start Delivering.
ELIMINATE FUEL LOGISTICS COMPLEXITY
ELIMINATE FUEL LOGISTICS COMPLEXITY
Canister-swap network removes fuel management from your operation:
• No convoy planning or armed escort requirements
• No fuel theft losses (20-30% recovery)
• No storage permit compliance burden
• Predictable delivery SLAs (24-48 hours)
• Hot-swap capability with zero project downtime
Canister-swap network removes fuel management from your operation:
• No convoy planning or armed escort requirements
• No fuel theft losses (20-30% recovery)
• No storage permit compliance burden
• Predictable delivery SLAs (24-48 hours)
• Hot-swap capability with zero project downtime
MEET NOISE & ENVIRONMENTAL RESTRICTIONS
MEET NOISE & ENVIRONMENTAL RESTRICTIONS
<45 dB(A) operation enables work where diesel is prohibited:
• Urban construction sites with residential proximity
• Night work without noise complaints
• Environmental sensitive zones
• Projects with strict ESG requirements
• Permit compliance without compromise
<45 dB(A) operation enables work where diesel is prohibited:
• Urban construction sites with residential proximity
• Night work without noise complaints
• Environmental sensitive zones
• Projects with strict ESG requirements
• Permit compliance without compromise
COST PREDICTABILITY & BUDGET CERTAINTY
COST PREDICTABILITY & BUDGET CERTAINTY
Transparent pricing structure protects project economics:
• Protection from diesel market volatility
• Predictable energy costs for duration of project
• Eliminate fuel theft losses
• Reduce convoy and security overhead
• Lower insurance costs (reduced fire/spill risk)
Transparent pricing structure protects project economics:
• Protection from diesel market volatility
• Predictable energy costs for duration of project
• Eliminate fuel theft losses
• Reduce convoy and security overhead
• Lower insurance costs (reduced fire/spill risk)
RELOCATABLE TO NEXT PROJECT
RELOCATABLE TO NEXT PROJECT
Modular systems move with your operations:
• Not stranded when project completes
• Relocate to next site (construction)
• Permanent installation option (mining)
• Energy-as-a-Service means we handle logistics
• Reduce capital tied up in depreciating generators
Modular systems move with your operations:
• Not stranded when project completes
• Relocate to next site (construction)
• Permanent installation option (mining)
• Energy-as-a-Service means we handle logistics
• Reduce capital tied up in depreciating generators
Every Scale. Every Site. One Platform.
Every Scale. Every Site. One Platform.
From a city high-rise to a remote mine. Zero CAPEX, Zero Compromise.
URBAN CONSTRUCTION SITES (50-200 kW)
URBAN CONSTRUCTION SITES (50-200 kW)
VapourGen for temporary project power
Typical: 100kW for high-rise construction
Silent operation for residential areas
Duration: Project lifecycle (6-24 months)
Relocatable to next project
VapourGen for temporary project power
Typical: 100kW for high-rise construction
Silent operation for residential areas
Duration: Project lifecycle (6-24 months)
Relocatable to next project
REMOTE INFRASTRUCTURE PROJECTS (200 kW - 1 MW)
REMOTE INFRASTRUCTURE PROJECTS (200 kW - 1 MW)
VapourGen or VapourGen-E
Typical: 500kW for highway/bridge construction
Eliminate convoy costs to remote locations
Duration: Major project (12-36 months)
VGE for sites beyond cost-effective fuel delivery
VapourGen or VapourGen-E
Typical: 500kW for highway/bridge construction
Eliminate convoy costs to remote locations
Duration: Major project (12-36 months)
VGE for sites beyond cost-effective fuel delivery
MINING OPERATIONS (1-10 MW)
MINING OPERATIONS (1-10 MW)
VapourGen-E with on-site hydrogen production
Typical: 5MW for medium-scale mining operation
Complete fuel sovereignty for remote mines
Duration: Permanent (mine life)
Scalable as operations expand
VapourGen-E with on-site hydrogen production
Typical: 5MW for medium-scale mining operation
Complete fuel sovereignty for remote mines
Duration: Permanent (mine life)
Scalable as operations expand
LARGE-SCALE INDUSTRIAL PROJECTS (10+ MW)
LARGE-SCALE INDUSTRIAL PROJECTS (10+ MW)
VapourGen-E with utility-scale renewables
Typical: Major infrastructure or mega-projects
Prime power for extended remote operations
Duration: Multi-year to permanent
Custom engineering for specific requirements
VapourGen-E with utility-scale renewables
Typical: Major infrastructure or mega-projects
Prime power for extended remote operations
Duration: Multi-year to permanent
Custom engineering for specific requirements
*All configurations via Energy-as-a-Service with zero CAPEX
Diesel Is Costing You More Than You Think
From markup to theft to downtime, here's exactly where Cosmos pays for itself.
01 | PRIMARY COST REDUCTIONS
01 | PRIMARY COST REDUCTIONS
• Eliminate remote site diesel markup (₹20-40/liter savings)
• Recover fuel theft losses (20-30% of consumption)
• Remove convoy and armed escort costs
• Eliminate storage permit compliance overhead
• Reduce maintenance downtime and costs
• Eliminate remote site diesel markup (₹20-40/liter savings)
• Recover fuel theft losses (20-30% of consumption)
• Remove convoy and armed escort costs
• Eliminate storage permit compliance overhead
• Reduce maintenance downtime and costs
02 | PROJECT VALUE CREATION
02 | PROJECT VALUE CREATION
• Enable night work (silent operation, no restrictions)
• Accelerate project timelines (no fuel delays)
• Meet environmental permits (zero emissions)
• Satisfy ESG requirements (net-zero construction)
• Reduce insurance costs (lower fire/spill risk)
• Enable night work (silent operation, no restrictions)
• Accelerate project timelines (no fuel delays)
• Meet environmental permits (zero emissions)
• Satisfy ESG requirements (net-zero construction)
• Reduce insurance costs (lower fire/spill risk)
03 | RELOCATABILITY VALUE
03 | RELOCATABILITY VALUE
• Move system to next project (no stranded capital)
• Energy-as-a-Service means we handle logistics
• Eliminate generator resale/disposal costs
• Maintain single energy solution across projects
• Move system to next project (no stranded capital)
• Energy-as-a-Service means we handle logistics
• Eliminate generator resale/disposal costs
• Maintain single energy solution across projects
04 | TYPICAL ECONOMICS ESTIMATIONS
04 | TYPICAL ECONOMICS ESTIMATIONS
• 100kW urban site: ₹50-75 lakh annual diesel → ₹35-55 lakh hydrogen
• 500kW remote project: ₹2.5-4 crore annual diesel → ₹1.8-3 crore hydrogen
• 5MW mining operation: ₹25-40 crore annual diesel → ₹18-30 crore hydrogen
• 100kW urban site: ₹50-75 lakh annual diesel → ₹35-55 lakh hydrogen
• 500kW remote project: ₹2.5-4 crore annual diesel → ₹1.8-3 crore hydrogen
• 5MW mining operation: ₹25-40 crore annual diesel → ₹18-30 crore hydrogen
*Complete project-specific ROI modeling during site assessment
Powering India's Critical Infrastructure
Powering India's Critical Infrastructure
Powering India's Critical Infrastructure
Cosmos systems are deployed across sectors where downtime is not an option.
Cosmos systems are deployed across sectors where downtime is not an option.
Answers to Your Most Common Questions
Answers to Your Most Common Questions
Technical and Strategic Insights into the Cosmos Energy Stack.
Technical and Strategic Insights into the Cosmos Energy Stack.
What's the difference between VapourGen and VapourGen-E?
How long do the systems last?
What happens if the system fails?
Do I need special permits for hydrogen storage?
What's the difference between VapourGen and VapourGen-E?
How long do the systems last?
What happens if the system fails?
Do I need special permits for hydrogen storage?
What's the difference between VapourGen and VapourGen-E?
How long do the systems last?
What happens if the system fails?
Do I need special permits for hydrogen storage?
Your Project Doesn't Need Diesel. It Never Did.
Diesel logistics are complex, expensive, and increasingly unnecessary. Cosmos replaces them. Cleaner, quieter, and more cost-effective from day one. Tell us about your site and we'll show you what it's worth.
Diesel logistics are complex, expensive, and increasingly unnecessary. Cosmos replaces them. Cleaner, quieter, and more cost-effective from day one. Tell us about your site and we'll show you what it's worth.